Official Field Report

System Restoration Log

Status
ONLINE & STABLE
Location
Savli GIDC
Equipment
Bitzer Compressor
Sector
Injection Molding
Response Time
45 Minutes

1. Initial Fault Diagnosis

The client reported a complete halt in production due to the primary industrial chiller tripping on high discharge pressure. Upon arrival at the facility, our engineering team conducted a thermal and acoustic diagnostic. The system was found completely locked out, and the compressor was drawing locked-rotor amps (LRA).

2. Execution & Resolution

  • Recovered existing R-134a refrigerant safely into cylinders to prevent environmental venting.
  • Dismantled the Bitzer semi-hermetic compressor. Discovered shattered valve plates caused by severe liquid slugging.
  • Replaced the valve plate assembly, flushed the system to remove metal particulate, and installed a high-capacity suction line filter drier.
  • Pulled a deep vacuum to 500 microns, recharged the system, and calibrated the Danfoss electronic expansion valve to prevent future liquid flood-back.
Outcome
Chiller restored to 100% capacity. Production line resumed with zero further delays.

Facing a similar breakdown in your facility?

Dispatch Atlas Aircon

Broadcast to B2B Network

Follow our official engineering updates on Instagram & YouTube.

Need help with this?

Atlas Aircon experts are available 24/7 in Vadodara.

Call Now
Call Engineer WhatsApp
Live Log
Connecting to dispatch...
Request Engineer ➔